3/31/2024 0 Comments Citect scada 2015![]() The upgrade made use of the Allen-Bradley PLC5 to ControlLogix I/O Wiring Conversion System to give the customer an extremely quick change-over to the latest in Allen-Bradley PLC Processors, and the SCADA components were migrated into the existing site Wonderware System Platform Environment. The project was primarily a risk management exercise aiming to remove components which are difficult to replace should a failure occur, to migrate away from stand-alone SCADA systems and to further the use of an existing centralised VMware architecture. ![]() The project was completed and coincided with a production shutdown in January 2016.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |